A structured, transparent process from site survey to ongoing support — delivering every project on time and to specification.
Assess location, roof structure, shading, load & grid connectivity to form the foundation of every project plan.
Engineering analysis to confirm the optimal system design, load matching and structural compatibility.
ROI projections, payback period & subsidy eligibility mapping so every client invests with full confidence.
Detailed single-line diagrams, layouts and material specifications tailored to exact site requirements.
Professional installation with testing, inspection & handover — ensuring full system performance from day one.
Remote monitoring, preventive maintenance and 24×7 AMC ensuring uninterrupted, peak-performance operation.
Shree Abhi Electricals & Engineering Pvt. Ltd. is a leading provider of rooftop solar systems, HT/LT electrical projects, and solar power plant installations across Tamil Nadu — delivering clean energy, reduced electricity bills, and government-subsidised solar solutions for homes, industries, and institutions.
With over 15 years of expertise in solar EPC contracting, transformer supply, inverter installation, and metro rail electrical works, we bring certified, end-to-end solar solutions that generate maximum ROI and ensure long-term energy independence for every client.
From 3 KW residential solar panels to 100 MW utility-scale solar plants, our team handles design, supply, installation, and AMC — making us Chennai's most trusted solar energy company for both domestic and industrial segments.
Model: PPA (Power Purchase Agreement)
Location: Thirumullaivoyal, Chennai
Duration: Oct 01, 2025 – Dec 31, 2025
Client: VGN Stafford Owners Welfare Association
"Completed 50% ahead of schedule — a landmark project demonstrating true professionalism and technical excellence."
— T. Yuvaraj, President, SFOWA (VGN Stafford)
"The project was completed well ahead of timeline, showcasing true professionalism, dedication, and technical excellence."
Model: EPC (Engineering, Procurement & Construction)
Location: Vadapalani, Chennai
Duration: Feb 04 – Feb 24, 2026 (3× faster than planned)
Scope: A Block Common Services
Client: AVM Asta Luxury Apartments
Once the pilot proves successful, all 12 towers will be taken up for full solar installation across the entire complex.
"The 25 KW installation at AVM Asta has been a game-changer. We achieved 80–90% reduction in electricity costs and the project was completed in just 15 days — well ahead of schedule."